The Required Building and Structural setbacks are contained in the Bingham Township Zoning Ordinance, Section 3.6, page 32.
Here is the Table in Section 3.6 with footnotes.
Here are some helpful definitions.
The required setbacks are dependent on the zoning district that the property is located in.
Refer to the zoning map.
Setbacks are measured to the eave line of structures.
It is the responsibility of the Property Owner and their contractor to verify that the required setbacks have been met.